Project Description
UC BERKELEY | Berkeley, California
Chalk One Up for the California Golden Bears
A dynamic campus deserves a dynamic digital display for its ball team. Enter D3, called up to create a digital scoreboard and LED video display for University of California, Berkeley.
The scoreboard, installed at the Evans Diamond baseball facility, home of the California Golden Bears, made its official debut after a record-setting three-day installation.
The completed project includes a 14 foot x 25 foot 16mm LED display, one 10 foot x 38 foot scoreboard, two 4 foot x 19 foot ad panels, two 14 foot x 7 foot ad panels, and one 4 foot x 38 foot ad panel. Additionally, a decorative steel truss with an illuminated LED logo was created to highlight Evans Diamond sponsor Chevrolet.
Now Evans Diamond Dazzles
The scoreboard package for Evans Diamond includes a fully integrated, customized front-end control system.
A video production suite includes a four-camera, 14-channel, HD production system with live streaming at the touch of a few buttons.
Additional features include a state-of-the-art instant-replay system, three high-definition cameras, and a custom graphics package with more than 500 high-definition animations and static images.
The Specs: How We Did It
Display
- D3® XVIEW® Dynamic LED Display XV16
- 260 x 440 pixels
- 10’ high x 38’ wide state-of-the-art LED Display
Control System
- D3® AEP™ Advanced Element Processor